Skip to main content
Institute of Advanced Technological and Commercial Studies

Practical guides

Tracking your progress through the programme

Three figures are enough to know where you stand: hours kept, modules validated and project progress. This guide builds the dashboard that gathers them and says how to read it each month, in five minutes.

The three measures that count

A programme is steered on few indicators, provided they are the right ones. Hours kept say whether the pace is real; validated modules say whether the syllabus is moving; the project says whether output is keeping up. All three are recorded in five minutes at month's end, and their trend over three months beats any impression.

  • Hours actually worked, recorded each week
  • Validated modules, with their credits
  • The project milestone reached, and the next one
  • Marking feedback received and integrated

Building your dashboard

  1. 01

    Record hours each week

    One figure a week, noted at the weekend review. Twenty seconds, and the series reads across a quarter.

  2. 02

    Tick off validated modules

    With their credits. The catalogue rule converts credits into hours and makes comparison possible.

  3. 03

    Mark the project milestone

    Reached or in progress. A project stalling three months in a row is the dashboard's most useful signal.

  4. 04

    Note integrated feedback

    Feedback counts when it is integrated, not when it is read. That distinction changes real progress.

  5. 05

    Compare over three months

    The trend matters more than the month. Three records are enough to decide on a pace adjustment.

Four indicators, four decisions

IndicatorWhat it measuresThe decision it drives
Hours keptThe reality of the weekly paceAdjust the number of blocks, up or down
Modules validatedProgress through the syllabusRedo a module or move to the next
Project milestoneContinuity of productionTighten the project scope
Integrated feedbackThe real effect of markingRework a point before moving on

Catalogue markers

Out of twenty-five hours of total work.

supervised hours per credit
10
modules described, with hours and credits
181
months of records to read a trend
3

Steering questions

What if the trend falls three months running?

Adjust the pace rather than the ambition: a move to a more spread-out pace is requested during the year and your acquired progress stays valid. A reduced pace that is kept goes further than an intended pace that is missed.

How do I convert credits into workload?

Through the official catalogue rule: one credit equals twenty-five hours of work, of which 10 are supervised. A six-credit module therefore represents a hundred and fifty hours of total work, which plans directly into weekly blocks.

Is progress kept if I pause?

Yes: your progress and validated results remain valid, and you resume where you stopped, without redoing what you passed. Resumption happens at the next session of the module concerned.

Tracking your progress through the programme — Practical guides | IHETC — IHETC