Running a supply chain means holding three constraints together: the lead time promised to the customer, the full cost of transport and storage, and the traceability of every batch. All three are measured and traded off.

Full cost, the only useful arbiter

Transport price alone cannot compare two solutions: you must add stock tied up during the journey, insurance cost, handling charges, duties paid and the risk of stockout. A slower, cheaper mode becomes expensive as soon as a stockout forces an emergency resupply. The full-cost calculation, set once per flow, turns that intuition into a documented decision.

  • A full cost per flow: transport, tied-up stock, handling, duties
  • A lead time promised to the customer, held by a sized safety stock
  • Batch-level traceability, from supplier to end customer
  • A controlled and recorded cold chain, when the goods require it
  • Tracked service indicators: service level, actual lead time, damage rate

Four modes, four trade-offs

The choice is made per flow and per product, never once and for all. The transport and logistics block builds that grid on the real flows participants bring.

ModeWhat it bringsWhat it requires you to anticipate
SeaThe lowest unit cost over long distancesA long lead time, therefore a sized safety stock
RoadDoor-to-door flexibilityRoute conditions and rotation planning
AirThe shortest lead timeA cost that assumes high-value goods
MultimodalThe cheapest combination at equal serviceTranshipment points, therefore stronger traceability

The scale of the logistics track

Modes, chartering, warehousing, traceability, full cost.

taught hours of logistics
220

Level 6, 5 competence blocks.

hours of the supply chain manager title
800

Level 7, 70 credits.

hours of the director title
700

Logistics questions

How is a safety stock sized?

On the observed variability of the replenishment lead time and on the target service level. Both parameters are measured from history, and their product gives a volume defensible to the finance department.

Which indicators should be tracked first?

Service level, actual end-to-end lead time and damage rate. Three figures are enough to describe a chain's performance and to pinpoint the link that needs action.

How is a batch traced across the whole chain?

Through a unique identifier assigned at source and carried through every transhipment, from supplier to end customer. That traceability governs batch recall and cold chain control.